Calder Remodeling News

See:
House Plan
Schedule
Top Stories
The Roof is Sealed!
3/27/2005 1:00:00 PM
After lots of rain both the lower and upper roofs are complete and papered.
Slideshow:  Sealed Roof The past month wasn't a total loss:
  • the second floor is completely framed
  • the second floor roof is complete
  • both the first floor and second floor roofs have protective paper coatings now.

And work has started on the lower (front) deck and the back retaining wall. It feels like we have started a new project phase.