Insulation Installed, Sheetrock to Follow
6/12/2005 9:00:00 PM

There hasn't been much to see in the past 2 weeks because the various trades have been finishing up their "rough-ins'. This week was a bit more dramatic:

The house is fully insulated and sheetrock is ready to be installed.

Slideshow:  Insulation OK, all of the windows and doors except the fancy wooden entry doors and the garage doors are installed and operational.

The painters primed the eaves with our house color (Coneflower - It's a deep yellow to complement the brown roof tiles.

The sheetrock installation may not begin this week because there is still some sheer wall that has to be installed on the first floor ceiling. No one seems to know how long it will take or when it will really happen.